In July 2020, the construction work began on the "Alabushevo" site No. 16 of the special economic zone "Technopolis "Moscow".
During the period since December 2020:
- preparation of the site for construction has been completed: a construction camp was erected, temporary utilities and roads were laid;
- the excavation pit for the building foundation has been prepared;
- the main stage of the construction work has begun and is ongoing.
The scheduled construction completion date for the design and engineering technology department is the 2nd quarter of 2023.
During the period since December 2020:
- preparation of the site for construction has been completed: a construction camp was erected, temporary utilities and roads were laid;
- the excavation pit for the building foundation has been prepared;
- the main stage of the construction work has begun and is ongoing.
The scheduled construction completion date for the design and engineering technology department is the 2nd quarter of 2023.